PASER Rating 3 of 10

Poor Condition

Severely deteriorated pavement with structural failure. Widespread alligator cracking, potholes, and base problems indicate this road has passed the point of rehabilitation and requires reconstruction.

Assessment image — add aerial photo here
ORCA aerial assessment — PASER 3 segment, poor condition with alligator cracking

What You'll See

  • Alligator (fatigue) cracking across wheel paths
  • Potholes and patching failures
  • Severe rutting deeper than 1/2 inch
  • Base failure — heaving, depressions, soft spots
  • Complete loss of surface aggregate in many areas

ORCA AI Detection

  • Dense, interconnected crack networks visible across segment
  • Dark patches indicating moisture infiltration and base damage
  • Surface texture irregularities from potholes and failed patches
  • Shadowing patterns from rutting and surface deformation

Recommended Action

Full reconstruction required. The pavement structure has failed and overlays will not last. The road needs to be rebuilt from the base up, including subgrade improvement, new aggregate base, and full-depth asphalt placement. Geotechnical investigation may be needed for drainage issues.

Estimated Treatment Cost

Full reconstruction: $40-80/sq yd depending on depth, drainage needs, and subgrade conditions. This is 3-5x the cost of treating the road at PASER 5-6. Temporary patching ($5-10/sq yd) may be needed as a stopgap measure.